Customization: | Available |
---|---|
Product Name: | Waterproof and Vapor Permeable Membrane |
Material: | PP No -Woven Fabric,Pet No-Woven Fabric ,Asphalt |
Still deciding? Get samples of $ !
Order Sample
|
Shipping Cost: | Contact the supplier about freight and estimated delivery time. |
---|
Payment Methods: |
![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() |
---|---|
Support payments in USD |
Secure payments: | Every payment you make on Made-in-China.com is protected by the platform. |
---|
Refund policy: | Claim a refund if your order doesn't ship, is missing, or arrives with product issues. |
---|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
serial | Test item | test method | YEP 500 | YEP 700 | |
1 | thickness | EN1849-1 | 0.8mm | 1.0mm | |
2 | gram weight | EN1849-1 | 500-600g/m2 | 700-800g/m2 | |
3 | tensile strength | vertical | EN12311-1 | ≥400N | ≥450N |
horizontal | ≥300N | ≥350N | |||
4 | elongation | vertical | EN12311-1 | ≥25% | ≥30% |
horizontal | ≥25% | ≥30% | |||
5 | tear strength | vertical | EN12310-1 | ≥100N | ≥120N |
horizontal | ≥100N | ≥120N | |||
6 | not permeable | EN1928 | 20kpa 24h | ||
7 | low temperature flexibility | EN1109 | -20degree | ||
8 | size stability | EN1107-1 | ≤2% | ||
9 | thermal aging | pull retention rate | EN13859 | ≥90% | |
elongation retention rate | ≥80% | ||||
low temperature flexibility | -15degree | ||||
dimension change rate | ≤2% |
»Q1. What's your product range?
A1:As a factory ,We mainly produce SBS modified bitumen membrane, ASTM standard paper based asphalt roofing felt, EN standard
breathable waterproof underlayment , self-adhesive polymer modified bituminous waterproof membrane and other waterproof coating.
»Q2. Can I order samples?Are you free for samples?
A2: Yes, we provide with free sample, and you should pay for the freight, which can show both of our sincerety, we can return back
the money to you when you place order from us.
»Q3. What's your delivery time?
A3:We are manufacturer, so we can efficiently control the production time, usually our delivery time is 10-25 working days.
»Q4. What's your payment terms?
A4:30% on deposit, 70% balance against copy of B/L after loading.